Project Details

Cryptocurrency Mining Campus Planning & Design

Intuva is working with a Midwest oil & gas company to correct a situation involving several other crypto-mining hosting companies who had provided quotes based on inaccurate assumptions and that lacked a clear design, plan, and budget. Intuva was able to create a conceptual site plan, and phased in construction approach to optimize capital spend and provide a clear path towards profitability

Situation

Midwest mining operation with large natural reserves

Multiple used 22MW aeroderivative gas being purchased

No site plan, no formal MEP, design, and detailed construction budget

Signed LOIs with three existing miner hosting companies based on poor assumptions

Resolution

Provide a Conceptual Site Plan and Electrical One-Line for budgeting

Develop a phased construction concept to optimize capital spend and profitability

Prepare to flow directly into bid, permits, construction, and operational phases

Installing 2 turbines for ~40MW to supply 24 x 1.3MW bitcoin mining containers

Plan to build 5 turbines ~80MW for both containers and immersion-cooling facility

Achieve electric generation cost < $0.025/ kWH and sold at $0.05 – 0.075 / kWH

Impact

Failure to meet LOI deadlines puts inside and outside investment capital at risk

Without proper planning and engineering technical mistakes could potentially become catastrophic

Highlights

Conceptual Design & Budgeting Services

Detailed Engineering Services

Group 6933

Case Studies you might like:

Lawrence Livermore National Laboratory

Engineering Services for a Pharmaceutical Company

Greenfield Data Center for a Research Lab