Crypto Mining Campus
![Rectangle 106 Rectangle 106](https://intuva.solutions/wp-content/uploads/2024/04/Rectangle-106.png)
Data Center Strategy
![Rectangle 106d Rectangle 106d](https://intuva.solutions/wp-content/uploads/2024/03/Rectangle-106d.png)
Data Center Design and Engineering
![Rectangle 108 Rectangle 108](https://intuva.solutions/wp-content/uploads/2024/04/Rectangle-108.png)
Data Center Construction and Commissioning
![Group 1018 Group 1018](https://intuva.solutions/wp-content/uploads/2024/03/Group-1018.png)
![output-onlinepngtools output-onlinepngtools](https://intuva.solutions/wp-content/uploads/2024/03/output-onlinepngtools.png)
![image 287 image 287](https://intuva.solutions/wp-content/uploads/2024/03/image-287.png)
![https://intuva.solutions/wp-content/uploads/2024/03/output-onlinepngtools.png](https://intuva.solutions/wp-content/uploads/2024/03/output-onlinepngtools.png)
![https://intuva.solutions/wp-content/uploads/2024/03/Group-1018.png](https://intuva.solutions/wp-content/uploads/2024/03/Group-1018.png)
![https://intuva.solutions/wp-content/uploads/2024/03/image-287.png](https://intuva.solutions/wp-content/uploads/2024/03/image-287.png)
Project Details
Cryptocurrency Mining Campus Planning & Design
Intuva is working with a Midwest oil & gas company to correct a situation involving several other crypto-mining hosting companies who had provided quotes based on inaccurate assumptions and that lacked a clear design, plan, and budget. Intuva was able to create a conceptual site plan, and phased in construction approach to optimize capital spend and provide a clear path towards profitability
Situation
Midwest mining operation with large natural reserves
Multiple used 22MW aeroderivative gas being purchased
No site plan, no formal MEP, design, and detailed construction budget
Signed LOIs with three existing miner hosting companies based on poor assumptions
Resolution
Provide a Conceptual Site Plan and Electrical One-Line for budgeting
Develop a phased construction concept to optimize capital spend and profitability
Prepare to flow directly into bid, permits, construction, and operational phases
Installing 2 turbines for ~40MW to supply 24 x 1.3MW bitcoin mining containers
Plan to build 5 turbines ~80MW for both containers and immersion-cooling facility
Achieve electric generation cost < $0.025/ kWH and sold at $0.05 – 0.075 / kWH
Impact
Failure to meet LOI deadlines puts inside and outside investment capital at risk
Without proper planning and engineering technical mistakes could potentially become catastrophic
Highlights
Conceptual Design & Budgeting Services
Detailed Engineering Services